Space
blog
(5)
Call3 Monitoring ERICA
blog
(1)
Call3 Monitoring KOMPEYE
blog
(5)
Call3 Monitoring MoFTaG
blog
(5)
Call3 Monitoring RODIN
blog
(6)
Call3 Monitoring SPEAKY

Results 21 - 22 of 22 sort by

blogPost
Our biggest event in the last two months was the preparation and realization of our exhibition an the Hannover fair (08.04. - 12.04.2013). We presented our enhanced FlexIRob system as it was evaluated in our user study with workers at Harting. In particular, we presented the fast configuration of the Kuka LWR IV to a confined...
[Last edited Apr 26, 2013 ]
blogPost
The project started on 2012-02-01 and a Kickoff meeting was held on 2012-02-16 in Berlin. We have discussed the first requirements for our experiment including appropriate room industrial robot measurement equipment mechanical tool interface power tools and workpieces. Now we work on the motion and force requirements of the...
[Last edited Mar 2, 2012 ]